slab for storage room poured today / by Philip Tarlow

5:32 PM: the concrete slab for the studio storage room was poured today, along with the slab in front of our house. next week, once the cement has thoroughly dried, construction will begin, and within2 weeks, it will be completed.

we had to go briefly to moffat, a 25 minute drive, mid-day, which broke up my day, and i didn’t get any painting done. but when i looked critically at 10/2/2021 painting/collage, i saw clearly that the right hand side needs work so it can integrate with the composition as a whole.. so that’s likely what i’ll do in the morning.